Energy from Waste plant Kiel/Germany

Customer:Müllverbrennung Kiel GmbH & Co KG
Measures:installation of two high pressure steam gas preheaters in front of the highest catalysts site to replace the installed natural gas burners
Results:the plant saves 4.5 GWh and 450,000 m3 natural gas per year and line
Special:

installation during plant operation, finishing work one week prior to the planned deadline.

Steinmüller Babcock Environment GmbH

Fabrikstraße 1

D-51643 Gummersbach, Germany

+49 (0) 2261 85 - 0

+49 (0) 2261 85 - 2999

info@steinmueller-babcock.com